The main park includes a capability of two hundred MW although Sandrini II provides a capability of one hundred MW. The entire cost of both equally jobs weren't disclosed nonetheless, all through construction, above two hundred employees were being utilized. The assignments are expected to see a handful of positions https://californiasolarpanel.food.blog/2024/08/23/what-should-you-consider-when-hiring-commercial-solar-contractors/