Proton engineers/designers need to have to start out the facelift plan now to be able to launch in 2 or 2 and half yrs from now. Don’t repeat similar mistake with preve (by now 4 yrs but no facelift, lots of challenges including melting wire, engine mounting, cooler pipe, CVT https://connerbkoqr.tusblogos.com/34711865/saga-cvt-for-dummies